-
Suggestion
-
Resolution: Duplicate
-
9
-
NOTE: This suggestion is for JIRA Cloud. Using JIRA Server? See the corresponding suggestion.
When an issue move from one state to the next, we need a reporting field like Resolution Date or Create Date field in the filter report where you specify a date range when an issue enter a certain state e.g. Open --> Accepted. The Transition tab in the ticket show last execution date which we want to see that in the filter report column. The field is not available when we run a filter report spreadsheet. (See image)
I ran across this article but the solution is using time stamp plugin which is not practical since it's outside of the filtered report in JIRA.
https://jira.atlassian.com/browse/JRA-28749
- duplicates
-
JSWCLOUD-25639 Implement report for tracking time in status in JIRA
- Gathering Interest
- is related to
-
JRACLOUD-12825 reporting on change history : especially on status change
- Closed
-
JRACLOUD-28749 How can we get a report of how long an issue is in each status
- Closed
-
JRACLOUD-68956 Track time between transition statues
- Closed
-
JRACLOUD-68991 Time that current ticket has been in that specific status
- Closed
-
JRASERVER-39293 How can we get a report time stamp for an issue is in each status
- Closed
-
JRACLOUD-63103 Way to collect exact time a issue spend in a workflow - JIRA Cloud
- Gathering Interest
-
JRACLOUD-66882 Report on status changes
- Gathering Interest
-
JRASERVER-63103 Way to collect exact time a issue spend in a workflow - Jira Server
- Gathering Interest
- relates to
-
JRACLOUD-29823 Lead time to enable reports containing time spent in status for a scoop of issues
- Closed
-
JRACLOUD-38133 Logged Time per Status Report
- Closed
-
JRACLOUD-41460 Reporting issue in time spend with respect to 'Status'
- Closed
-
JRACLOUD-69384 Time in Status
- Closed
-
JRACLOUD-69843 reporting on change history - Calculation of time spent in a particular status
- Closed
-
JRACLOUD-41234 Time In Source Status for each transition
- Gathering Interest
-
JSWCLOUD-25639 Implement report for tracking time in status in JIRA
- Gathering Interest