-
Suggestion
-
Resolution: Fixed
This should offer similar functionality to the planning mode for the Scrum Boards as in Using Plan Mode. For example:
- Display and estimate.
- Organising via Epics.
- Column Done status.
- Swim lane and cell constraints.
- incorporates
-
JSWSERVER-13690 Improve Prioritising of Issues in a Kanban Board
- Closed
-
JSWSERVER-15014 Add Epic Tab in Kanban Labs (Similar to Backlog in Scrum Boards)
- Closed
- is duplicated by
-
JSWSERVER-6373 Feature request: Drag sprints into version in Kanban Board (like Scrum Board)
- Closed
-
JSWSERVER-8433 As a greenhopper administrator I'd like to configure the fields displayed on the cards in the kanban rapid board
- Closed
-
JSWSERVER-8741 Allow pre-planning versions for Kanban board
- Closed
-
JSWSERVER-9875 As a Kanban user I want planning view
- Closed
-
JSWSERVER-12869 Ability to limit the issues shown on Active Sprint mode of Kanban Board
- Closed
-
JSWSERVER-13507 Epics in the backlog view of the scrumban board
- Closed
- is related to
-
JSWSERVER-7052 EPIC: Kanban Epics Support
- Closed
-
JSWSERVER-7833 Allow quicksearch for KanBan boards (Work mode)
- Gathering Interest
-
JSWSERVER-8724 Provide a kanban chart report and gadget that shows story points
- Gathering Interest
- relates to
-
JSWSERVER-7204 Epic in Kanban rapid boards
- Closed
-
JSWSERVER-8723 Provide Version management in KanBan plan mode
- Closed
-
JSWSERVER-11402 Ranking a new issue directly underneath the currently selected issue doesn't work on Kanban boards
- Closed
-
JSWSERVER-7992 Ability to see sub-tasks in the backlog
- Gathering Interest
-
LOLCATS-118 Loading...
- links to
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
Form Name |
---|
Yes, please!!!!
Having only these two fixed board types SCRUM and KANBAN without any means to configure a mixture seems absolutely weird!
If you want to be religious about either of the two processes, please be, but allow others to configure the tool to their needs. Each of the differences between the boards should be configuration options with the two existing styles being simply two default configurations.