-
Suggestion
-
Resolution: Tracked Elsewhere
-
None
-
None
-
None
Issue:
When dragging an issue in a Kanban board to a different column, most if the time, it is hard to keep track of the previous order that you are working on prior to dragging because it re-scroll to the top. In this way, you have to manually scroll down and look for the tasks that you were previously looking at and it consumes a lot of time.
Suggestion:
It would be great if the list of the tasks won't scroll to the top of the column where you are dragging the issue at after changing the priority.
- is incorporated by
-
JSWSERVER-6175 As a Kanban PO I would like the Plan mode so that I may order and groom a large backlog
- Closed
-
JSWSERVER-15236 Kanban Backlog (Kanplan) for JIRA Software Server
- Closed