Issue Summary
When updating a Story, audit log shows a reference to "Jira Project Changed" being updated to null even though that is not modified.
Steps to Reproduce
- Open a Story and modify description then hit save.
- Check Audit log
Expected Results
Audit log should only indicate the field modified.
Actual Results
Audit log shows the field "Jira Project Changed" that was not modified/changed as empty.
Workaround
None
- is duplicated by
-
JIRAALIGN-2195 Story: Jira Project updated in Audit log with blank
- Closed
- resolves
-
ALIGNSP-6492 Loading...