Version Report graph does not show 100% completion when all Story Points are Done. For example, from the default generated Sample Scrum Project:

      • The version has 8 out of 8 story points complete.

      The Graph accurate depicts the Story Point axis on the left with 8 Story Points complete, but the Percentage is incorrect. The Percent axis on the right shows 90%, where 100% would be expected.

      I've run multiple tests with different versions and projects and the results are the same, where the percentage does not reach 100%.

      Steps to reproduce:

      • Generate the Sample Scrum Board for JIRA Agile
      • Navigate to Version Reports
      • Check the different versions and observe the graphs
      • Compare to the list of issues, notice that all stories are complete, but the graph never reaches 100%

            [JSWSERVER-12265] Version Report Does not 100% when all Stories are Done

            There are no comments yet on this issue.

              Unassigned Unassigned
              dchan David Chan
              Affected customers:
              0 This affects my team
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: