Uploaded image for project: 'Jira Software Data Center'
  1. Jira Software Data Center
  2. JSWSERVER-12265

Version Report Does not 100% when all Stories are Done

    XMLWordPrintable

Details

    • Bug
    • Resolution: Duplicate
    • Low
    • None
    • 6.7.7
    • None

    Description

      Version Report graph does not show 100% completion when all Story Points are Done. For example, from the default generated Sample Scrum Project:

      • The version has 8 out of 8 story points complete.

      The Graph accurate depicts the Story Point axis on the left with 8 Story Points complete, but the Percentage is incorrect. The Percent axis on the right shows 90%, where 100% would be expected.

      I've run multiple tests with different versions and projects and the results are the same, where the percentage does not reach 100%.

      Steps to reproduce:

      • Generate the Sample Scrum Board for JIRA Agile
      • Navigate to Version Reports
      • Check the different versions and observe the graphs
      • Compare to the list of issues, notice that all stories are complete, but the graph never reaches 100%

      Attachments

        Issue Links

          Activity

            People

              Unassigned Unassigned
              dchan David Chan
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: