In Control Chart report time frame, user get an error "from date required" in custom tab

XMLWordPrintable

    • Type: Bug
    • Resolution: Fixed
    • Priority: Medium
    • 6.5.0
    • Affects Version/s: 6.3.6.1
    • Component/s: None
    • 6.03

      Steps to reproduce the problems:

      1. Modify the javascript date time in Advanced General Settings as per javascript_datetime.png
      2. Go to Control Chart, change the date time in custom tab.
      3. Get the following results:

      Finding

      • The problem happen on FF, Chrome and IE 9 browser
      • Try other date time pattern as per example_2.png
      • The problem not reproducible when the date time pattern is in default mode (eg. 28/Dec/2013). Switching to default date format is not possible now because of https://jira.atlassian.com/browse/GHS-6145.

        1. example_1.png
          17 kB
          John Chin
        2. example_2.png
          16 kB
          John Chin
        3. javascript_datetime_2.png
          24 kB
          John Chin
        4. javascript_datetime.png
          24 kB
          John Chin

            Assignee:
            Unassigned
            Reporter:
            John Chin (Inactive)
            Votes:
            8 Vote for this issue
            Watchers:
            15 Start watching this issue

              Created:
              Updated:
              Resolved: