In Control Chart report time frame, user get an error "from date required" in custom tab

XMLWordPrintable

    • Type: Bug
    • Resolution: Fixed
    • Priority: Medium
    • 6.5.0
    • Affects Version/s: 6.3.6.1
    • Component/s: None
    • 6.03

      Steps to reproduce the problems:

      1. Modify the javascript date time in Advanced General Settings as per javascript_datetime.png
      2. Go to Control Chart, change the date time in custom tab.
      3. Get the following results:

      Finding

      • The problem happen on FF, Chrome and IE 9 browser
      • Try other date time pattern as per example_2.png
      • The problem not reproducible when the date time pattern is in default mode (eg. 28/Dec/2013). Switching to default date format is not possible now because of https://jira.atlassian.com/browse/GHS-6145.

        1. javascript_datetime.png
          javascript_datetime.png
          24 kB
        2. javascript_datetime_2.png
          javascript_datetime_2.png
          24 kB
        3. example_2.png
          example_2.png
          16 kB
        4. example_1.png
          example_1.png
          17 kB

              Assignee:
              Unassigned
              Reporter:
              John Chin (Inactive)
              Votes:
              8 Vote for this issue
              Watchers:
              15 Start watching this issue

                Created:
                Updated:
                Resolved: