-
Bug
-
Resolution: Unresolved
-
Medium (View bug fix roadmap)
-
None
-
7.5.0
-
7.05
-
4
-
Severity 3 - Minor
-
20
-
When inputting a multi-line text in the Sprint Goal field, it either does not show the entire text or overlaps with the top of the backlog (see screenshots attached).
Steps to reproduce.
Enter a text that spans multiple lines in the Sprint Goal field in an Agile Board.
Expected results.
The field expands and the page adjusts to show the entire text without overlapping/covering other page elements.
Actual results.
The field either shows a single line that does not fit the entire text or expands down covering the top of the backlog.
Workarounds
None
- is related to
-
JSWSERVER-20433 Sprint Goal should support multi line text input
- Gathering Interest
- relates to
-
JSWSERVER-21296 A tooltip with the full text of the Sprint Goal isn't shown when accessing the Backlog of a Scrum Project
-
- Gathering Impact
-
- mentioned in
-
Page Failed to load
+1 for implementation of this change. Also to allow formatting of the sprint goals field.