Set new SLA for a issue after moved to another project SD

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Unresolved
    • None
    • Component/s: SLA
    • 7
    • 9

      I have two project with 2 metrics SLAs.

      Goal for Time to Resolution SLA for Project 1 in Project 1 = 4 hour

      Goal for Time to Resolution SLA for Project 2 in Project 2 = 1,5 hour

      The SLAs start executing for Project 1 and now an issue is moved from Project 1 to Project 2, the goal time remaining for this issue in Project 1 is 60 minutes.

       

      Present:

      The issue moved to Project 2. In Project 2, the Goal for this issue starts from 60 minutes as it got moved from Project 1. Remaining time for this issue in Project 2 is 30 minutes only.

       

      Expected:

      The issue moved to Project 2. In Project 2, the Goal for Time to Resolution SLA for Project 1 is stoped on 60 minutes, and Goal for Time to Resolution SLA for Project 2 start from 0 minutes.

       

      Sugestion:
       
      Add to SLA metric (Start, Stop, Pause on) option Move conditions

        1. SSM and TSSM in STG2.docx
          4.65 MB
        2. Search Options of all Portals.docx
          7.51 MB
        3. Claims Reports.docx
          3.43 MB
        4. CAF Reports.docx
          7.79 MB
        5. Auditor RFI in STG2.docx
          4.37 MB
        6. ADP in STG2.docx
          665 kB
        7. ADC in STG2.docx
          689 kB

            Assignee:
            Unassigned
            Reporter:
            Deleted Account (Inactive)
            Votes:
            40 Vote for this issue
            Watchers:
            29 Start watching this issue

              Created:
              Updated: