    • Our product teams collect and evaluate feedback from a number of different sources. To learn more about how we use customer feedback in the planning process, check out our new feature policy.

      Update from Roadmaps team - 3 Aug 2022

      Hi all, 

      Thank you for your patience throughout this time.  The ability to schedule child/story-level issues with dates is now available for Kanban projects on Jira Software Cloud on Free, Standard, and Premium editions.
      For those customers part of an enterprise edition of Jira Software Cloud, if you have not seen it yet, this feature will be rolled out by September 15th (PST). 

      Our research with agile software teams using Kanban led us to this approach - so thank you for being involved in the EAP or Beta, and for your feedback here. 
      More here: https://community.atlassian.com/t5/Jira-Software-articles/What-s-new-in-the-Roadmap-view-I-m-so-glad-you-asked/ba-p/2077594 

      This feature is not enabled by default on each project, but it’s easy to turn on (if you have project permissions). Learn how to enable child-level planning for kanban teams. The roadmap uses the fields "Start date" and "Due date" to reflect the timeline bar schedule. 

      For scrum teams, child issues are scheduled according to the sprint to which they’re assigned. On your roadmap, the schedule bar for all child issues is the same size regardless of their estimated duration, aligning with the sprints at the top header of the roadmap. You will need to have sprints created with dates to see them on the roadmap. https://support.atlassian.com/jira-software-cloud/docs/schedule-work-for-scrum-teams-on-your-roadmap/ 

      If you have any queries or additional feedback you would like to provide via email or a zoom call, you can contact us here: jira-cloud-roadmaps@atlassian.com

      Thank you,

      Rathesh Richards, Product Manager, Jira Software. 

       

      Update from Roadmaps team - 07 June 2022

      The feedback that you’ve given here or through other channels has been invaluable in informing our product planning. 

      • We have provided functionality for scrum projects (existing behavior).
        • Once you expand the epic, you will see the stories/tasks and any existing dependencies. If you have scheduled (with dates) sprints in the backlog, the sprints will be displayed in the header of the roadmap. If the story-level issue start/end date has been assigned to a scheduled sprint, each issue will automatically display on the roadmap in alignment with the sprint dates it is assigned (and not from the start/due date fields, if they are being used).
          Example: if a story/task is assigned to "sprint 1" with dates 02/11/22 - 12/11/22, the story/task will be displayed that it will start and end to be delivered in that sprint timeframe.
          Given Jira Software is an Agile project management tool, this follows closely with the Scrum framework, where work is scoped to be delivered within the timeframe of a sprint. https://support.atlassian.com/jira-software-cloud/docs/schedule-work-for-scrum-teams-on-your-roadmap/
        • For Kanban projects, this is currently not possible to show the explicit dates for the child issues. We are currently working on a solution in BETA. Only participants in the current BETA group have the ability to schedule stories/tasks using explicit dates for Kanban projects. Please keep in mind that planning and scheduling issues from the Roadmap not only affects the Roadmap view, but also flows onto the board and backlog. We are gathering the feedback from the wider BETA group to make sure that the dates set, do not impact the development team's existing processes within Agile. We hope to make this available for all Kanban projects on all editions of Jira Software Cloud (including free and standard) by the end of July.

      If you would like to provide specific feedback or chat over a zoom call about your team needs, then feel free to email our team at: jira-cloud-roadmaps@atlassian.com

      Rathesh | Product Management, Roadmaps.

      Problem

      Currently, we can see only the date range for Epics that doesn't include the start and end date of the child issues.

      Suggestion

      Add the date range separately for each child issues.

            [JRACLOUD-91581] Date range for child issues on roadmap

            Just an update for Enterprise accounts: 
            The roll-out takes a little longer due to the communication required with our enterprise customers. For those customers part of an enterprise edition of Jira Software Cloud, if you have not seen it yet, this feature will be rolled out by September 15th (PST). 

            Rathesh Richards (Inactive) added a comment - Just an update for Enterprise accounts:   The roll-out takes a little longer due to the communication required with our enterprise customers. For those customers part of an enterprise edition of Jira Software Cloud, if you have not seen it yet, this feature will be rolled out by September 15th (PST). 

            Thanks Rathesh for linking those additional issues so we could vote for them!

            Laura Adams added a comment - Thanks Rathesh for linking those additional issues so we could vote for them!

            ef95f667bfcb  thanks for the support! Go vote on issue 
            JSWCLOUD-23411  to make our Jira dreams come true! 

            Nora Buerhop added a comment - ef95f667bfcb   thanks for the support! Go vote on issue  JSWCLOUD-23411   to make our Jira dreams come true! 

            Hi all, thank you for your continued feedback since the [release of the ability to schedule story-level issues feature |https://community.atlassian.com/t5/Jira-Software-articles/What-s-new-in-the-Roadmap-view-I-m-so-glad-you-asked/ba-p/2077594]for kanban projects.

            We hear you. So, in order to dig deeper into the additional requests, understand the key problem, and how basic Roadmaps can help your team plan effectively - Here is an existing, and a new suggestion ticket that highlights the recent comments on this ticket:

            Thanks,

            Rathesh Richards, Product Manager - Jira Software Cloud

            Rathesh Richards (Inactive) added a comment - - edited Hi all, thank you for your continued feedback since the [release of the ability to schedule story-level issues feature | https://community.atlassian.com/t5/Jira-Software-articles/What-s-new-in-the-Roadmap-view-I-m-so-glad-you-asked/ba-p/2077594 ]for kanban projects. We hear you. So, in order to dig deeper into the additional requests, understand the key problem, and how basic Roadmaps can help your team plan effectively - Here is an existing, and a new suggestion ticket that highlights the recent comments on this ticket: If you have the need for scrum teams/projects to be able to better sequence child issues within a sprint , feel free to highlight the problem with a comment and vote:  https://jira.atlassian.com/browse/JSWCLOUD-23411 If your team feels they are missing some visibility of sub-tasks on the roadmap , then feel free to continue to vote here:  https://jira.atlassian.com/browse/JSWCLOUD-18677   Thanks, Rathesh Richards, Product Manager - Jira Software Cloud

            I second the comments by Nora and Collin:

            There is little added benefit in having sub-tasks simply mirror the duration of the sprint.
            It would be ideal if their duration bars would be displayed independently of the sprint duration.

            I hope you will consider this in a future release.

            The Michael added a comment - I second the comments by Nora and Collin: There is little added benefit in having sub-tasks simply mirror the duration of the sprint. It would be ideal if their duration bars would be displayed independently of the sprint duration. I hope you will consider this in a future release.

            Hi again Jira Team, 

             

            also I was trying do use the same function (Daterange on roadmap from kanban project) while planning my company managed Jira project. There the function for viewing the datrange for childissues doesn't seem to be enabled :/ Since it's already on team managed level, it would make sense to have it on company managed project level aswell.

             

            Thanks again! 

             

            Nora Buerhop added a comment - Hi again Jira Team,    also I was trying do use the same function (Daterange on roadmap from kanban project) while planning my company managed Jira project. There the function for viewing the datrange for childissues doesn't seem to be enabled :/ Since it's already on team managed level, it would make sense to have it on company managed project level aswell.   Thanks again!   

            JerAmi added a comment -

            Does this extend to sub-tasks as well? Can it?

            JerAmi added a comment - Does this extend to sub-tasks as well? Can it?

            When will this feature be enabled for scrum board projects? I would love to be able to see actual end dates on child issues for issues that were completed before the sprint ended. 

            Mai Torralba added a comment - When will this feature be enabled for scrum board projects? I would love to be able to see actual end dates on child issues for issues that were completed before the sprint ended. 

            Colin Tennery added a comment - - edited

            1,000.000% Agree with Nora Buerhop's comment. It is abundantly apparent how long a Sprint is with current implementation; but for scrum, getting more fidelity in how long individual issues/tasks may take within a given Sprint is key and what, ultimately, provides valuable and necessary utility when trying to plan and manage large scale projects with thousands of issues/tasks. It makes no sense and adds zero value to visually show deadlines for individual issues/tasks by representing them as the same length of time as a sprint they are currently contained in. I'm sure there are many Jira users that don't follow an Agile/Scrum methodology to the the letter/by the book (gasp!) and often adapt it to work best for their needs and this should be considered where it can be on Atlassian's side. For example, I'm sure there are managers out there that may even create tasks that are (gasp!) longer than a determined Sprint interval and that may also be intended to span multiple Sprints along the way.

            Thanks for listening!

             
            9e85fad61184 added a comment - 10 hours ago
            First of all thanks for working on this issue, daterange for child issues in kanban has unlocked a great visible overview for my teams progress. 
            Now a question...
            I understand that in scrum having child issues showing the same daterange as the Sprint they belong to makes sense according to the scrum framework, however it doesn't give any added value to Jira as a tool since it is self evident that child issues in scrum must be solved in the timframe of the sprint they belong to. 
            My team and some others I've read would much rather have the same functionality as in the Kanban Roadmap where you can visually see the deadlines for each childissue to get a better visual overview of the workflow order of tasks and dependencies inside each sprint. maybe this is something you already consider?
             
            Looking forward to your response! 

            Colin Tennery added a comment - - edited 1,000.000% Agree with Nora Buerhop's comment . It is abundantly apparent how long a Sprint is with current implementation; but for scrum, getting more fidelity in how long individual issues/tasks may take within a given Sprint is key and what, ultimately, provides valuable and necessary utility when trying to plan and manage large scale projects with thousands of issues/tasks. It makes no sense and adds zero value to visually show deadlines for individual issues/tasks by representing them as the same length of time as a sprint they are currently contained in. I'm sure there are many Jira users that don't follow an Agile/Scrum methodology to the the letter/by the book (gasp!) and often adapt it to work best for their needs and this should be considered where it can be on Atlassian's side. For example, I'm sure there are managers out there that may even create tasks that are (gasp!) longer than a determined Sprint interval and that may also be intended to span multiple Sprints along the way. Thanks for listening!   9e85fad61184  added a comment - 10 hours ago First of all thanks for working on this issue, daterange for child issues in kanban has unlocked a great visible overview for my teams progress.  Now a question... I understand that in scrum having child issues showing the same daterange as the Sprint they belong to makes sense according to the scrum framework, however it doesn't give any added value to Jira as a tool since it is self evident that child issues in scrum must be solved in the timframe of the sprint they belong to.  My team and some others I've read would much rather have the same functionality as in the Kanban Roadmap where you can visually see the deadlines for each childissue to get a better visual overview of the workflow order of tasks and dependencies inside each sprint. maybe this is something you already consider?   Looking forward to your response! 

            First of all thanks for working on this issue, daterange for child issues in kanban has unlocked a great visible overview for my teams progress. 
            Now a question...
            I understand that in scrum having child issues showing the same daterange as the Sprint they belong to makes sense according to the scrum framework, however it doesn't give any added value to Jira as a tool since it is self evident that child issues in scrum must be solved in the timframe of the sprint they belong to. 
            My team and some others I've read would much rather have the same functionality as in the Kanban Roadmap where you can visually see the deadlines for each childissue to get a better visual overview of the workflow order of tasks and dependencies inside each sprint. maybe this is something you already consider?
             
            Looking forward to your response! 

            Nora Buerhop added a comment - First of all thanks for working on this issue, daterange for child issues in kanban has unlocked a great visible overview for my teams progress.  Now a question... I understand that in scrum having child issues showing the same daterange as the Sprint they belong to makes sense according to the scrum framework, however it doesn't give any added value to Jira as a tool since it is self evident that child issues in scrum must be solved in the timframe of the sprint they belong to.  My team and some others I've read would much rather have the same functionality as in the Kanban Roadmap where you can visually see the deadlines for each childissue to get a better visual overview of the workflow order of tasks and dependencies inside each sprint. maybe this is something you already consider?   Looking forward to your response! 

            Hi aaf380f1e6a0 , sorry to hear that you're unable to schedule child issues: "I have the "Schedule Child Issue" switch set for both a Kanban and a Scrum project, and I cannot schedule any other Issue Types, aside from Epic, on the Roadmap." 

            To further help you with this, can you please raise a support ticket ticket at https://support.atlassian.com/contact

            Otherwise in the meantime, if the settings is turned on, can you please check the following:

            • If sprints are enabled for the project ( i.e. you can see the sprints header on the Roadmap) then you can assign the child issues to sprints by clicking on the sprints dropzones. You will need some active/future sprints with start and end dates in your backlog. If you hover your mouse over the row, you should be able to see the dropzones appear (light blue bars). By clicking on the dropzone it will assign the child issue to a sprint, and you will see the bar. 
            • If sprints aren't enabled for the project (i.e. you don't see the sprints header on the Roadmap) then you you can click/ click & drag the bar on the row to set the start/due date and make the bar appear for the child issue. Or otherwise, if you set a Start date and Due date for the child issue through the issue details panel on the right, it should appear. 

            Jessica Tran added a comment - Hi aaf380f1e6a0 , sorry to hear that you're unable to schedule child issues: "I have the "Schedule Child Issue" switch set for both a Kanban and a Scrum project, and I cannot schedule any other Issue Types, aside from Epic, on the Roadmap."   To further help you with this, can you please raise a support ticket ticket at https://support.atlassian.com/contact Otherwise in the meantime, if the settings is turned on, can you please check the following: If sprints are enabled for the project ( i.e. you can see the sprints header on the Roadmap) then you can assign the child issues to sprints by clicking on the sprints dropzones. You will need some active/future sprints with start and end dates in your backlog. If you hover your mouse over the row, you should be able to see the dropzones appear (light blue bars). By clicking on the dropzone it will assign the child issue to a sprint, and you will see the bar.  If sprints aren't enabled for the project (i.e. you don't see the sprints header on the Roadmap) then you you can click/ click & drag the bar on the row to set the start/due date and make the bar appear for the child issue. Or otherwise, if you set a Start date and Due date for the child issue through the issue details panel on the right, it should appear. 

            Hi all, 

            Thank you for your patience throughout this time. As commented above - the ability to schedule story-level issues with dates is now available for Kanban projects on Jira Software Cloud on all editions, Free included. Our research with agile software teams using Kanban led us to this approach - so thank you for being involved in the EAP or Beta, and for your feedback here. 
            More here: https://community.atlassian.com/t5/Jira-Software-articles/What-s-new-in-the-Roadmap-view-I-m-so-glad-you-asked/ba-p/2077594 

            This feature is not enabled by default on each project, but it’s easy to turn on (if you have project permissions). Learn how to enable child-level planning for kanban teams. The roadmap uses the fields "Start date" and "Due date" to reflect the timeline bar schedule. 

            For scrum teams, child issues are scheduled according to the sprint to which they’re assigned. On your roadmap, the schedule bar for all child issues is the same size regardless of their estimated duration, aligning with the sprints at the top header of the roadmap. You will need to have sprints created with dates to see them on the roadmap. https://support.atlassian.com/jira-software-cloud/docs/schedule-work-for-scrum-teams-on-your-roadmap/ 

            If you have any queries or additional feedback you would like to provide via email or a zoom call, you can contact us here: jira-cloud-roadmaps@atlassian.com

            Thank you,

            Rathesh Richards, Product Manager, Jira Software. 

            Rathesh Richards (Inactive) added a comment - Hi all,  Thank you for your patience throughout this time. As commented above - the ability to schedule story-level issues with dates is now available for Kanban projects on Jira Software Cloud on all editions, Free included. Our research with agile software teams using Kanban led us to this approach - so thank you for being involved in the EAP or Beta, and for your feedback here.  More here: https://community.atlassian.com/t5/Jira-Software-articles/What-s-new-in-the-Roadmap-view-I-m-so-glad-you-asked/ba-p/2077594   This feature is not enabled by default on each project, but it’s easy to turn on (if you have project permissions). Learn how to enable child-level planning for kanban teams . The roadmap uses the fields "Start date" and "Due date" to reflect the timeline bar schedule.  For scrum teams, child issues are scheduled according to the sprint to which they’re assigned. On your roadmap, the schedule bar for all child issues is the same size regardless of their estimated duration, aligning with the sprints at the top header of the roadmap. You will need to have sprints created with dates to see them on the roadmap. https://support.atlassian.com/jira-software-cloud/docs/schedule-work-for-scrum-teams-on-your-roadmap/   If you have any queries or additional feedback you would like to provide via email or a zoom call, you can contact us here: jira-cloud-roadmaps@atlassian.com Thank you, Rathesh Richards, Product Manager, Jira Software. 

            Vamsi Divi added a comment -

            For my Jira Roadmaps I have to use the following fields: Start date and Due date to see the child issues of an Epic to show up on a roadmap.

            My teams have been using Target start and Target end fields which did NOT show up on the Roadmap. 

            Vamsi Divi added a comment - For my Jira Roadmaps I have to use the following fields: Start date and Due date to see the child issues of an Epic to show up on a roadmap. My teams have been using Target start and Target end fields which did NOT show up on the Roadmap. 

            tjohnson added a comment -

            @K. Ariga - 

             

            Happy to help test when you make changes to fix this for relatively recent projects.

            I have the "Schedule Child Issue" switch set for both a Kanban and a Scrum project, and I cannot schedule any other Issue Types, aside from Epic, on the Roadmap.

            tjohnson added a comment - @K. Ariga -    Happy to help test when you make changes to fix this for relatively recent projects. I have the "Schedule Child Issue" switch set for both a Kanban and a Scrum project, and I cannot schedule any other Issue Types, aside from Epic, on the Roadmap.

            Chalie Lam added a comment -

            Appreciated your response Laura.

            I am also having the same experience with Kanab type project that I can not explain. Only happening to new Kanban projects. 

            Chalie Lam added a comment - Appreciated your response Laura. I am also having the same experience with Kanab type project that I can not explain. Only happening to new Kanban projects. 

            I had something similar and it had something to do with where I'd created the sprints.  Since I hadn't created them from that board, they didn't show up?  but sometimes they do?  It's weird.  Don't forget you have to put dates on the sprints.

            Laura Adams added a comment - I had something similar and it had something to do with where I'd created the sprints.  Since I hadn't created them from that board, they didn't show up?  but sometimes they do?  It's weird.  Don't forget you have to put dates on the sprints.

            Chalie Lam added a comment - - edited

            This is strange. I have some existing projects and the child scheduling is working well.

            I created new two project, team managed, scrum & kanban, this feature doesn't seem to be working.
            Anyone experiencing the same?

            Chalie Lam added a comment - - edited This is strange. I have some existing projects and the child scheduling is working well. I created new two project, team managed, scrum & kanban, this feature doesn't seem to be working. Anyone experiencing the same?

            tjohnson added a comment -

            I even created a new project that was scrum and this does not work on my board.

            tjohnson added a comment - I even created a new project that was scrum and this does not work on my board.

            Its beautiful!  Thank you!

            Deleted Account (Inactive) added a comment - Its beautiful!  Thank you!

            tjohnson added a comment -

            It's not working for me on a Kanban board.

             

            The setting is set.

            tjohnson added a comment - It's not working for me on a Kanban board.   The setting is set.

            Szabó Dávid added a comment - - edited

            Szabó Dávid added a comment - - edited It is out now, you need to set in roadmap settings: https://community.atlassian.com/t5/Jira-Software-articles/What-s-new-in-the-Roadmap-view-I-m-so-glad-you-asked/ba-p/2077594?utm_source=product-announcement-email&utm_medium=email&utm_campaign=jswc-july-round-up_EML-13044&jobid=105659889&subid=1636276685#M710

            tjohnson added a comment -

            I would also like to know the date of the release of this feature, please.

             

            tjohnson added a comment - I would also like to know the date of the release of this feature, please.  

            Thanks in advance to all the Jira geniuses for working on this feature; being able to see date range and dependencies at the child issue level on roadmaps decreases OUR dependency on external solutions for long-term capacity planning.

            John Stewart added a comment - Thanks in advance to all the Jira geniuses for working on this feature; being able to see date range and dependencies at the child issue level on roadmaps decreases OUR dependency on external solutions for long-term capacity planning.

            Hello,
            I see in one of the comments above that this feature was scheduled to be released during the summer.
            Sadly not being part of the Beta group, I would like to know if the expected release date is now known ?  

            Thanks

            Elliot Mugner added a comment - Hello, I see in one of the comments above that this feature was scheduled to be released during the summer. Sadly not being part of the Beta group, I would like to know if the expected release date is now known ?   Thanks

            mike.heyns added a comment - - edited

            if a story/task is assigned to "sprint 1" with dates 02/11/22 - 12/11/22, the story/task will be displayed that it will start and end to be delivered in that sprint timeframe.

            Are there any plans to allow setting explicit start/end dates on child issues when using sprints? It works really well in Kanban mode.

            Sprint duration can vary across teams/organizations and making all child issues the same duration makes it difficult to manage dependencies using the roadmap and visualise a sprint load properly.

            In other words, when looking at the roadmap, all stories in the sprint appear to have equal weight/size.

            mike.heyns added a comment - - edited if a story/task is assigned to "sprint 1" with dates 02/11/22 - 12/11/22, the story/task will be displayed that it will start and end to be delivered in that sprint timeframe. Are there any plans to allow setting explicit start/end dates on child issues when using sprints? It works really well in Kanban mode. Sprint duration can vary across teams/organizations and making all child issues the same duration makes it difficult to manage dependencies using the roadmap and visualise a sprint load properly. In other words, when looking at the roadmap, all stories in the sprint appear to have equal weight/size.

            Hi there - Thanks to those who raised the issue with the Beta no longer being active. 
            This issue has now been resolved, and if you had access to the Beta before, you should see it active again. Please let me know if you do not see it. 

            We apologize for any disruption this may have caused you and your team overnight, and hope you can continue planning and aligning on work together  

            For those NOT in the beta group, never fear - we are close to a full release in July 2022 with a few changes in how the feature is enabled for your roadmap for the first time. 
            We'll keep you updated on this ticket with the exact release date, and how to enable the feature on your instance. For those in EAP/Beta group, there will be no additional setup needed for your instance.

            Thanks again, 

            Rathesh Richards, Product Manager - Jira Software cloud. 

             

            Rathesh Richards (Inactive) added a comment - Hi there - Thanks to those who raised the issue with the Beta no longer being active.  This issue has now been resolved, and if you had access to the Beta before, you should see it active again. Please let me know if you do not see it.  We apologize for any disruption this may have caused you and your team overnight, and hope you can continue planning and aligning on work together   For those NOT in the beta group, never fear - we are close to a full release in July 2022 with a few changes in how the feature is enabled for your roadmap for the first time.  We'll keep you updated on this ticket with the exact release date, and how to enable the feature on your instance. For those in EAP/Beta group, there will be no additional setup needed for your instance. Thanks again,  Rathesh Richards, Product Manager - Jira Software cloud.   

            We were also part of the beta and now the feature has disappeared. It has lead to quite a bit of confusion with our team since the visualization of our child issues with the entire project is no longer available. Would appreciate re-enabling the feature or providing a release date.

            Thorson Bastien added a comment - We were also part of the beta and now the feature has disappeared. It has lead to quite a bit of confusion with our team since the visualization of our child issues with the entire project is no longer available. Would appreciate re-enabling the feature or providing a release date.

            I went through the survey again because we are no longer in the EAP for our project. Not sure why we don't have this feature anymore.

            We use this feature daily and it was critical for our operations. Please re-enable this for us again or please provide a release date for this feature.

            zacharychapman@magnolia.com added a comment - I went through the survey again because we are no longer in the EAP for our project. Not sure why we don't have this feature anymore. We use this feature daily and it was critical for our operations. Please re-enable this for us again or please provide a release date for this feature.

            We were a part of the beta and it was going well and super handy to use, but not we're not? Can you please re-enable for us as we have many projects on the go and coordinating across them without this feature is very difficult.

            Glen Weatherhead added a comment - We were a part of the beta and it was going well and super handy to use, but not we're not? Can you please re-enable for us as we have many projects on the go and coordinating across them without this feature is very difficult.

            +1

            +1

            Mike Daly added a comment -

            +1

            Mike Daly added a comment - +1

            Shivangi Paul added a comment - - edited

            +1

            Shivangi Paul added a comment - - edited +1

            jeankim added a comment -

            +1

            jeankim added a comment - +1

            +1

            Martijn Bos added a comment - +1

            Bob Brinks added a comment -

            +1

            Bob Brinks added a comment - +1

            +1

            +1

            Martina Sly added a comment - +1

            +1

            Matt Wright added a comment - +1

            Any chance I can get added to the Beta pretty please ?

            Andrew Hatch added a comment - Any chance I can get added to the Beta pretty please ?

            Owen Scott added a comment -

            +1

            Owen Scott added a comment - +1

            John Vis added a comment -

            +1

            John Vis added a comment - +1

            +1

            Cecilia Wolff added a comment - +1

            +1

            +1

            Lukas Barda added a comment - +1

            +1

            Victor Ortiz added a comment - +1

            +1

            Benkő Renáta added a comment - +1

            This is so stupid simple to implement I'm really struggling to understand why it's not already a feature.

            Aleksander Altberg added a comment - This is so stupid simple to implement I'm really struggling to understand why it's not already a feature.

            +1

            Oron Kaiser added a comment - +1

            +1

            Szabó Dávid added a comment - +1

            +1

             

            Aurél Sziebert added a comment - +1  

            It is very important to anyone who understands the importance of this functionality and have actually worked on projects.

            Unfortunately those at Atlassian make changes that make no sense and are not logical rather than what the PAYING customer needs.

            Jean Gordon added a comment - It is very important to anyone who understands the importance of this functionality and have actually worked on projects. Unfortunately those at Atlassian make changes that make no sense and are not logical rather than what the PAYING customer needs.

            +1 

            I see this issue very important. 

            Kaisu.Hedberg added a comment - +1  I see this issue very important. 

            m.portelli added a comment -

            +1 

            This is a must-have feature in my opinion. We are working on a project at the moment and are finding real issues with not having this feature enabled to show timelines for Stories and Tasks, and subsequent dependencies, on the Roadmap page. 

            Is there any way that our organisation can join the Beta group please as we have a project we're prepping for at the moment that would greatly benefit from this feature?

            m.portelli added a comment - +1  This is a must-have feature in my opinion. We are working on a project at the moment and are finding real issues with not having this feature enabled to show timelines for Stories and Tasks, and subsequent dependencies, on the Roadmap page.  Is there any way that our organisation can join the Beta group please as we have a project we're prepping for at the moment that would greatly benefit from this feature?

            Hi all - Thank you for your additional feedback and patience.

            We’re happy to announce that our Early access Program for this feature went well, and the Kanban Story level issue planning feature is headed for Beta starting this week.

            Participants for the beta have been chosen at random. If you’re part of the beta group, you’ll see a lozenge that reads Beta feature enabled and you’ll be able to plan child issues on your roadmap for Kanban teams. The feature requires no setup to use.

            The EAP has now ended, but those who were part of the EAP still have access to the feature. The only thing that’s changed is the lozenge mentioned above.

            Assuming the beta goes well, we expect to roll this feature (with some improvements) out to all users on all cloud editions in the upcoming months. As always, we’ll keep you updated on this ticket.
             
            Thanks,
            Rathesh Richards, Product Manager - Jira Software. 

            Rathesh Richards (Inactive) added a comment - Hi all - Thank you for your additional feedback and patience. We’re happy to announce that our Early access Program for this feature went well, and the Kanban Story level issue planning feature is headed for Beta starting this week. Participants for the beta have been chosen at random. If you’re part of the beta group, you’ll see a lozenge that reads Beta feature enabled and you’ll be able to plan child issues on your roadmap for Kanban teams. The feature requires no setup to use. The EAP has now ended, but those who were part of the EAP still have access to the feature. The only thing that’s changed is the lozenge mentioned above. Assuming the beta goes well, we expect to roll this feature (with some improvements) out to all users on all cloud editions in the upcoming months. As always, we’ll keep you updated on this ticket.   Thanks, Rathesh Richards, Product Manager - Jira Software. 