-
Suggestion
-
Resolution: Unresolved
-
1
-
STR:
1. Go to backlog
2. Make different ranking
3. Open ranked item
4. Open audit log
ER: Audit Log should provide details on the specific rank. For example, Program ABC and PI XYZ should be included if that was the rank that was changed.
AR: it says only changed number
- is related to
-
JIRAALIGN-4331 Epic Backlog: Moving newly created work item from initial placement to new rank does not log audit entry
- Long Term Backlog
-
ALIGNSP-14931 Loading...
- relates to
-
JIRAALIGN-4319 Epic Backlog: Program context not recorded in Audit Log
- Closed
-
ALIGNSP-14930 Loading...
-
ALIGNSP-14933 Loading...