DONE % information in the Progress bar tooltip does not honor the Progress Bars Portfolio platform settings

XMLWordPrintable

      Issue Summary

      The DONE % Shown on the Progress bar tooltip does not match the Progress bar when the Progress Bars Status is set to use Count in the Portfolio platform settings.

      Steps to Reproduce

      Pre-Requisite:
      Set Progress by Count for the Progress Bars Status under:
      Jira Align Administration > Settings section> Platform> Portfolio tab> Manage: Progress Bars
      or
      Jira Align Administration > Settings section> Platform> Portfolio Specific configuration > {PortolioName}

      1. Create an Epic
      2. Create a feature as a child of the Epic
      3. Create a story as a child of the feature
      4. Accept the story without adding any estimation point
      5. Accept the feature
      6. Go back to the Epic and scroll down to the Features section
      7. Observe the progress bar of the feature
      8. Hover over the progress bar to display the tooltip

      Expected Results

      The DONE % matches the progress bar taking into account the Portfolio settings: Progress by Count
      Here is an example of how it could look:

      Actual Results

      The DONE % does not match the progress bar as it is always based on the Story Points and does not take into account the Portfolio settings: Progress by Count

      Workaround

      Currently, there is no known workaround for this behavior. A workaround will be added here when available

        1. image-2023-12-14-14-52-34-971.png
          300 kB
          Francois Panaget
        2. image-2023-12-14-15-16-27-165.png
          157 kB
          Francois Panaget

            Assignee:
            Bhanu Vanjaku
            Reporter:
            Francois Panaget (Inactive)
            Votes:
            5 Vote for this issue
            Watchers:
            10 Start watching this issue

              Created:
              Updated: