-
Type:
Bug
-
Resolution: Unresolved
-
Priority:
Medium
-
None
-
Affects Version/s: 10.127.2, 10.128.3
-
Component/s: Epics - Grid, Features - Grid
-
7
-
Severity 3 - Minor
-
No
Issue Summary
The DONE % Shown on the Progress bar tooltip does not match the Progress bar when the Progress Bars Status is set to use Count in the Portfolio platform settings.
Steps to Reproduce
Pre-Requisite:
Set Progress by Count for the Progress Bars Status under:
Jira Align Administration > Settings section> Platform> Portfolio tab> Manage: Progress Bars
or
Jira Align Administration > Settings section> Platform> Portfolio Specific configuration > {PortolioName}
- Create an Epic
- Create a feature as a child of the Epic
- Create a story as a child of the feature
- Accept the story without adding any estimation point
- Accept the feature
- Go back to the Epic and scroll down to the Features section
- Observe the progress bar of the feature
- Hover over the progress bar to display the tooltip
Expected Results
The DONE % matches the progress bar taking into account the Portfolio settings: Progress by Count
Here is an example of how it could look:
Actual Results
The DONE % does not match the progress bar as it is always based on the Story Points and does not take into account the Portfolio settings: Progress by Count
Workaround
Currently, there is no known workaround for this behavior. A workaround will be added here when available
- is related to
-
JIRAALIGN-6297 Ability to not show the Story Point information in the Progress bar tooltip
-
- Short Term Backlog
-
- is connected to
-
JAWM-5794 Loading...
- mentioned in
-
Page Loading...
- relates to
-
ALIGNSP-29263 Loading...
-
PS-165272 Loading...
- resolves
-
ALIGNSP-22657 Loading...
-
ALIGNSP-23009 Loading...
-
PS-158581 Loading...