Uploaded image for project: 'Jira Align'
  1. Jira Align
  2. JIRAALIGN-5081

Kanban Boards: Lean Metrics are not capturing correctly the number of cards

XMLWordPrintable

    • 1
    • Severity 3 - Minor
    • No

      Issue Summary

      Reports inside Lean Metrics are not capturing correctly the number of cards on the Kanban Boards.
      Report "Section Size By Swim Lane" always displays 0

      Report "Section Counts By Swim Lane" is not removing the cards that are moved from column A to B.

      Report "Sections Over Their WIP Limit" is not removing the cards that are moved from column A to B.

      Steps to Reproduce

      1. Go to the Kanban Boards
      2. Create a New Board
      3. Set up Swim Lanes and Columns
      4. Define WIPs for the columns
      5. Now add cards over the WIP limit in 2 columns
      6. Move the cards from one column to the next, leaving just one with more cards than the WIP
      7. Go to More Actions > Lean Metrics and see the reports mentioned previously

      Expected Results

      Data of reports would match what the board has.

      Actual Results

      Data in the reports are incorrect.

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available

        1. wip_over_2.png
          441 kB
          Diego Larangeira
        2. wip_over_1.png
          433 kB
          Diego Larangeira
        3. section_1.png
          479 kB
          Diego Larangeira
        4. lean_2.png
          390 kB
          Diego Larangeira
        5. lean_1.png
          382 kB
          Diego Larangeira

            dfuller@atlassian.com Don Fuller
            a8cff3407f0b Diego Larangeira
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: