Uploaded image for project: 'Jira Align'
  1. Jira Align
  2. JIRAALIGN-4808

Jira Connector: when using points as estimation system, connector is sending both points and t-shirt to Jira

XMLWordPrintable

    • 2
    • Severity 3 - Minor
    • No

      Issue Summary

      If the Portfolio is configured to use Points as an estimation system, when an update is made on a Feature on JA, it will send both Points and T-Shirt to Jira, ignoring the selection of the Portfolio.


      Note that if the estimation of the Portfolio is T-Shirt, only it is being sent.

      Steps to Reproduce

      1. Set the portfolio estimation system as Points
      2. In Administration > Jira Settings > Jira Setup, configure the custom fields for feature Points and T-shirt. Set both to Bidirectional Sync.
      3. In Jira, make sure that there is a points custom field configured and there is NO T-Shirt custom field.
      4. Create a Feature on JA and wait for it so sync with Jira successfully.
      5. Update it and see the error on the audit logs

      Expected Results

      The estimation system configuration would be respected, and only Points estimate would be sent by the connector to Jira. It should not send the T-shirt field.

      Actual Results

      Both points and T-Shirt is being sent to Jira even though the estimation system is set to points.

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available

        1. connector_t_shirt.png
          447 kB
          Diego Larangeira
        2. feature_t_shirt.png
          480 kB
          Diego Larangeira

              csmith1@atlassian.com Cap Smith
              a8cff3407f0b Diego Larangeira
              Votes:
              1 Vote for this issue
              Watchers:
              6 Start watching this issue

                Created:
                Updated:
                Resolved: