Uploaded image for project: 'Jira Align'
  1. Jira Align
  2. JIRAALIGN-3657

Points Planned vs Points Accepted report has "vs." in the left Menu bar

XMLWordPrintable

    • Severity 3 - Minor
    • No

      Issue Summary

      Inconsistent naming from the Report item in the Menu bar to what's actually seen in the report.
      In some areas of Jira Align the "vs" has a "vs*.*" (a full stop after the letter "s")

      Steps to Reproduce

      1. Check Menu - has the "full stop"
      2. Check Search results - has the "full stop"
      3. Search in the Reports - has the "full stop"
      4. The "Points Planned vs. Points Accepted" box in Reports - has the full stop
      5. Look at "Points Planned vs Points Accepted" Report - no "full stop"
      6. Look at "Points Planned vs Points Accepted" Chart title - "no full stop"
      7. Documentation in help.jiraalign.com - no full stop.

      Expected Results

      Consistency in naming.

      Actual Results

      Has the full stop


      Doesn't have the full stop

      Workaround

      Ignore

        1. image-2021-10-01-17-23-55-700.png
          23 kB
          Heidi Hendry
        2. image-2021-10-01-17-24-15-878.png
          27 kB
          Heidi Hendry
        3. image-2021-10-01-17-25-40-195.png
          38 kB
          Heidi Hendry
        4. image-2021-10-01-17-26-47-820.png
          21 kB
          Heidi Hendry
        5. image-2021-10-01-17-28-54-411.png
          16 kB
          Heidi Hendry

            kforeman@atlassian.com Kyle Foreman
            81fb6d9e7236 Heidi Hendry (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated:
              Resolved: