-
Bug
-
Resolution: Won't Fix
-
Low
-
None
-
10.98.2
-
1
-
Severity 3 - Minor
-
No
Issue Summary
When on Kanban board, the Story cards shows a 0/0 tasks associated with it, even though there are tasks for that Story. After clicking the Add/Edit buton on it, the Tasks appear without issue.
Steps to Reproduce
- Go to Kanban Boards-> Click on view board
- Open one Story Card with a double click
- Go to the task tab
- See the 0/0
- Now click on the Add/Edit and see the Taks associated
Expected Results
The number of tasks would be presented.
Already created Tasks should be present in tab tasks
Actual Results
It is displayed 0/0 no matter how many tasks are associated.
Workaround
Currently there is no known workaround for this behavior. A workaround will be added here when available
- relates to
-
JIRAALIGN-3505 Kanban Board: Adding Task through the Story Card throws an error
- Closed
- is related to
-
JAWM-2063 Loading...
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...