-
Bug
-
Resolution: Cannot Reproduce
-
Low
-
None
-
10.98.2
-
1
-
Severity 3 - Minor
-
No
Issue Summary
When opening an Story card that is present on the Kanban Board, the Task tabs shows 0 (even if there are tasks associated with this Story), and after hiting edit/Add and filling the needed fields, an error effort hours cannot be empty is thrown.
Steps to Reproduce
- Go to Kanban Boards-> Click on view board
- Open one Story Card with a double click
- Go to the task tab
- Click on add/Edit
- Fill all the details and click Add
Expected Results
The Task would be created.
Actual Results
Error effort hours cannot be empty is thrown.
Workaround
To add a Task to the board:
- Click on the column 3 blue lines
- Fast add-> Tasks
- Fill all the details -> Save and Add to board
- is related to
-
JIRAALIGN-3509 Kanban Board: Story cards don't show the tasks associated with it
- Closed
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
- resolves
-
ALIGNSP-10578 Loading...