[JIRAALIGN-2050] Team Cards: gap is needed between team names and percent progress.

XMLWordPrintable

    • 1
    • Severity 3 - Minor
    • Breakers - TART6
    • None

      Issue Summary

      Teams with longer team names are causing confusion because word-wrap seems to connect it with the progress value when the screen is set to the smallest recommended size (1280x700)

      Steps to Reproduce

      1. Create a team with a long team name. (example: Team (This is a team with 50char length name)
      2. Navigate to Program Room and observe the Team Load and* Team Load vs Capacity* cards

      Expected Results

      There should be a clear distinction between the team name and team progress.

      Actual Results

      Team name and progress seems to be connected:

      Workaround

      This occurs when the screen size is reduced to the smallest recommended Jira Align screen size. Maximizing the screen should help.

            Assignee:
            Iryna Dziadyk (Inactive)
            Reporter:
            Leo.Soronio
            Votes:
            1 Vote for this issue
            Watchers:
            5 Start watching this issue

              Created:
              Updated:
              Resolved: