-
Bug
-
Resolution: Fixed
-
Low
-
10.78
-
1
-
Severity 3 - Minor
-
Breakers - TART6
Issue Summary
Teams with longer team names are causing confusion because word-wrap seems to connect it with the progress value when the screen is set to the smallest recommended size (1280x700)
Steps to Reproduce
- Create a team with a long team name. (example: Team (This is a team with 50char length name)
- Navigate to Program Room and observe the Team Load and* Team Load vs Capacity* cards
Expected Results
There should be a clear distinction between the team name and team progress.
Actual Results
Team name and progress seems to be connected:
Workaround
This occurs when the screen size is reduced to the smallest recommended Jira Align screen size. Maximizing the screen should help.