Bug
-
Resolution: Fixed
-
Medium
-
10.74
-
Severity 3 - Minor
-
Stubborn Dragons - USH2, Stubborn Dragons - USH4, Stubborn Dragons - USH6, Stubborn Dragons - BBSH
Issue Summary
Scope Change: Team Weeks line is not reflecting Scope and Scope changes
Steps to Reproduce
- Login
- In the Context Menu select a Program that is using TW estimation system. In addition, some features should exist in this Program with TW estimate defined.
- Select Release in the Context Menu.
- Go to the Release Scope Change Report.
- Check TW line in the Chart.
Expected Results
Team weeks should be removed here, it is currently based off Feature estimation which incorrect.
Also, Column on the feature table below the scope change chart should show a feature estimate column titled "Feature Estimate"
Actual Results
The Team Weeks line is not changing at all. It shows 0 all the time.
Workaround
Currently there is no known workaround for this behavior. A workaround will be added here when available
- resolves
-
JIRAALIGN-1604 [JIRAALIGN-1604] Scope Change Report: Team Weeks vs Points
- Closed
-
ALIGNSP-4636 Loading...