Reports: Points planned in Points Planned vs. Points Accepted Report are not filtered by the Extra Configs

    XMLWordPrintable

Details

    • 1
    • Severity 3 - Minor

    Description

      Issue Summary

      Reports: Points planned in Points Planned vs. Points Accepted Report are not filtered by the Extra Configs

      Steps to Reproduce

      1. Login.
      2. Select some Program with multiple teams assigned to it.
      3. Teams should have Stories assigned, LOE for Stories should be defined. Some Stories should be accepted.
      4. Go to Points Planned vs. Points Accepted Report report.
      5. Apply filtering by some Team.
      6. Check Report.
      7. Reset filtering by Team and Apply filtering by Release Vehicle.
      8. Check Report.

      Expected Results

      Points Planned values in the report are filtered by Team/Release Vehicle.

      Actual Results

      Points planned in Points Planned vs. Points Accepted Report are not filtered by the Extra Configs

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available

      Attachments

        Issue Links

          Activity

            People

              idziadyk@atlassian.com Iryna Dziadyk (Inactive)
              rpetrunyak@atlassian.com Roman Petrunyak (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Backbone Issue Sync