Bug
-
Resolution: Fixed
-
High
-
10.73
-
7
-
Severity 3 - Minor
-
No
Issue Summary
Stories are not showing up green as they are 0 % done based on task hours, even though all the tasks are complete. This is causing features to look less complete than they actually are. Users can not fix this issue as once stories are accepted.
Steps to Reproduce
- Step 1 - Ensure that the progress bar setting is configured to track progress by points not counts
- Step 2 - Create a story with multiple task
- Step 3 - Complete each task with 0 hours
- Step 4 - Navigate to the team room and see progress bars and hover over the story progress bar
Expected Results
Story progress should be 100% when all tasks are done (even if not time tracked against tasks) or if the story is accepted.
Example: if 2 of 3 are complete, we won't know if the last has hours. so the progress should be 0 if no task hours are burnt even if 2 of 3 are complete. Then switch to 100% when all task are complete despite the hours.
This ER was sent from kforeman@atlassian.com
Actual Results
The progress bar and hover are showing 0% done
Workaround
No work around at this time.
- relates to
-
JIRAALIGN-3963 Story Progress Bar for an Accepted Story with all Tasks done shows 0% when all tasks have 0 hours logged
- Closed
-
JIRAALIGN-786 Tasks being moved through the states without time entry automatically should not have .1 hour time entered
- Closed
- is related to
-
ALIGNSP-11368 Loading...
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
- resolves
-
ALIGNSP-2690 Loading...
-
ALIGNSP-4369 Loading...
-
ALIGNSP-4432 Loading...
-
ALIGNSP-6200 Loading...