Uploaded image for project: 'Jira Align'
  1. Jira Align
  2. JIRAALIGN-1378

[JIRAALIGN-1378] Story Progress Bar: When all task are complete users see 0% done even though all task are complete (due to no task hours associated)

    XMLWordPrintable

Details

    • 7
    • Severity 3 - Minor
    • No

    Description

      Issue Summary

      Stories are not showing up green as they are 0 % done based on task hours, even though all the tasks are complete. This is causing features to look less complete than they actually are. Users can not fix this issue as once stories are accepted. 

      Steps to Reproduce

      1. Step 1 - Ensure that the progress bar setting is configured to track progress by points  not counts
      2. Step 2 - Create a story with multiple task
      3. Step 3 - Complete each task with 0 hours 
      4. Step 4 - Navigate to the team room and see progress bars and hover over the story progress bar

      Expected Results

      Story progress should be 100% when all tasks are done (even if not time tracked against tasks) or if the story is accepted.

      Example:  if 2 of 3 are complete, we won't know if the last has hours. so the progress should be 0 if no task hours are burnt even if 2 of 3 are complete. Then switch to 100% when all task are complete despite the hours.

      This ER was sent from kforeman@atlassian.com

      Actual Results

      The progress bar and hover are showing 0% done

      Workaround

      No work around at this time.

      Attachments

        Issue Links

          Activity

            People

              8a5f256dcbdc Sergii Drachuk (Inactive)
              ddortch@atlassian.com Darryl Dortch (Inactive)
              Votes:
              14 Vote for this issue
              Watchers:
              29 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Backbone Issue Sync