Uploaded image for project: 'Confluence Data Center'
  1. Confluence Data Center
  2. CONFSERVER-96029

Time of new event is not pre-populated in Team Calendar in the week-view

      Issue Summary

      Issue 1:
      When clicking on the calendar in the week-view, the time of the new event is not pre-populated in the popup.

      Issue 2:
      Also, when we drag around an event in the week-view to reschedule it, the event still has the old time in the preview popup and page need to be reloaded as a workaround.

      This work fine on latest LTS v8.5.11

      This is reproducible on Data Center: Yes

      Steps to Reproduce

      Step-1. Create a new Calendar event after switching to week-view.

      Step-2. When we drag around an event in the week-view to reschedule it, the event still has the old time in the preview popup and page needs to be reloaded as a workaround.

      Expected Results

      The time of the new event is pre-populated in the popup.
      Also, when we drag around an event in the week-view to reschedule it, the event still has the right time in the preview popup.

      Actual Results

      The time of the new event is not pre-populated in the popup.
      Also, when we drag around an event in the week-view to reschedule it, the event still has the old time in the preview popup

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available.

      Note

      The problem doesn't appear on latest LTS v8.5.11

        1. screen1.png
          125 kB
          Shekhar Gupta
        2. screen2.png
          313 kB
          Shekhar Gupta
        3. screen3.png
          172 kB
          Shekhar Gupta
        4. screen4.png
          347 kB
          Shekhar Gupta

          Form Name

            [CONFSERVER-96029] Time of new event is not pre-populated in Team Calendar in the week-view

            Mohit Sharma made changes -
            Remote Link New: This issue links to "Page (Confluence)" [ 950085 ]
            Mohit Sharma made changes -
            Remote Link New: This issue links to "Page (Confluence)" [ 949797 ]
            Maxim Leizerovich made changes -
            Link New: This issue resolves CONFSERVER-97795 [ CONFSERVER-97795 ]
            Rob made changes -
            Labels Original: ewt-ctb-improve-existing warranty New: KR1-L2LR ewt-ctb-improve-existing warranty
            Zac Xu made changes -
            Remote Link New: This issue links to "Confluence Bundled Plugins 90 › Confluence Jira-Integration Plugins › issue-90-CONFSERVER-96029-fix-week-view-issues (server-syd-bamboo)" [ 930941 ]
            Zac Xu made changes -
            Remote Link New: This issue links to "Confluence Bundled Plugins 89 › Confluence Jira-Integration Plugins › issue-89-CONFSERVER-96029-fix-week-view-issues (server-syd-bamboo)" [ 927929 ]
            Zac Xu made changes -
            Fix Version/s Original: 9.0.1 [ 108911 ]
            Fix Version/s New: 9.1.0 [ 108795 ]
            Zac Xu made changes -
            QA Demo Status Original: Not Done [ 14330 ] New: Done [ 14331 ]
            Resolution New: Fixed [ 1 ]
            Status Original: In Review [ 10051 ] New: Closed [ 6 ]
            Zac Xu made changes -
            Status Original: In Progress [ 3 ] New: In Review [ 10051 ]
            Zac Xu made changes -
            Fix Version/s New: 9.0.1 [ 108911 ]

              zxu2@atlassian.com Zac Xu
              2ff3e5e81230 Shekhar Gupta
              Affected customers:
              0 This affects my team
              Watchers:
              4 Start watching this issue

                Created:
                Updated:
                Resolved: