-
Suggestion
-
Resolution: Fixed
NOTE: This suggestion is for Confluence Server. Using Confluence Cloud? See the corresponding suggestion.
I would love a feature to display two defined dates (coming from JIRA) in the embedded Team-Calendars JIRA calendar the same way, an event is displayed within the events calendar (a bar starting at date1, drawn to date2).
This would be a great improvement and helps us using JIRA even better (and away from only doing software development with it).
- is blocked by
-
JRASERVER-12572 Versions needs start/end fields or should allow custom fields
- Closed
- is duplicated by
-
CONFSERVER-50972 Start/end dates for JIRA issues
- Closed
- is related to
-
CONFSERVER-50625 is there any Integration Services available
- Closed
-
CONFSERVER-50690 Why I dont see version start date in the jira calender - I see only Version end date - The team wants that feature to show both date's
- Closed
-
CONFSERVER-50214 Show date range of JIRA versions
- Closed
-
CONFSERVER-50352 display the task as a block, calculated based on due date and backwards based on estimated time of development
- Closed
-
CONFSERVER-51208 Allow JIRA calendars to select custom date fields from project
- Closed
-
CONFSERVER-51269 Time Line view for Calendars
- Closed
-
CONFSERVER-51285 Ability to create JIRA versions from Team Calendars
- Closed
- relates to
-
CONFCLOUD-51108 Show a date range in a JIRA calendar
- Closed
-
JRADEV-16097 Loading...
- links to
- mentioned in
-
Wiki Page Loading...