-
Type:
Suggestion
-
Resolution: Duplicate
-
None
-
Component/s: Board configuration
-
None
As a sprint master I would like to have the possibilty to use epics as a predefined swinlane fllter on a Kanban Board type. This possibilty allows me to track epics through phases outside of the sprints.
- duplicates
-
JSWSERVER-9144 Swimlane by epic for Kanban boards
- Closed