-
Bug
-
Resolution: Fixed
-
High
-
None
-
None
NOTE: This bug report is for JIRA Software Server. Using JIRA Software Cloud? See the corresponding bug report.
The calculation of the scope change is sometimes not correct.
Steps to reproduce
- Create a sprint in Plan Mode
- Create 5 issues with an estimate of '2' each.
- Add all 5 issues to the future sprint.
- Remove one of the issues from the future sprint.
- Start the sprint with the remaining 4 issues.
- Look at the Sprint Health Gadget - the scope change amount will be 0%.
- Remove another issue from the sprint.
- Look at the Sprint Health Gadget again.
Expected
The scope change amount should be -25% – 8 points originally in scope, and 2 were removed.
Actual
The scope change amount is -40%.
- is caused by
-
JSWSERVER-9797 Issue moved out of sprint before start, still shows on reports
- Closed
- is related to
-
JSWSERVER-9790 Sprint Report does not include Story Points added to a Planned Sprint
- Closed
-
JSWSERVER-11334 Sprint report does not include story points added to a started sprint
- Closed
- relates to
-
JSWCLOUD-9783 Sprint Health Gadget scope change calculation is incorrect
- Closed
-
JST-75641 Loading...
- Testing discovered
-
JSWSERVER-9885 Sprint Health Gadget appears to double count scope change
- Closed