-
Suggestion
-
Resolution: Duplicate
-
None
-
None
When using the stories swimlane option rank from the plan mode is not respected.
- In plan mode, plan a sprint with a ticket without any issues as first
- Add another ticket that has sub-tasks after the first ticket
- Start the sprint with those two tickets
Expected behavior would be that the first ticket would show first then the second ticket. Actual behavior is that the ticket(s) with sub-tasks area always on top of everything else.
- duplicates
-
JSWSERVER-6053 When basing swimlanes by Stories it would be a great feature to choose where issues without sub-tasks will be shown.
- Gathering Interest