It would be helpful for a user to be able to select epic as a preconfigured swimlane on the scrum boards

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Fixed
    • 6.2.1
    • Component/s: None

      It would be great if there was already a preconfigured option for epics when basing swimlanes when configuring the scrum board.

              Assignee:
              Unassigned
              Reporter:
              Davey Lei
              Votes:
              50 Vote for this issue
              Watchers:
              39 Start watching this issue

                Created:
                Updated:
                Resolved: