Scope Change caused by moving issue to another sprint is only presented at the first time on the Burndown Chart and Sprint Report

      Issue Summary

      When the same issue has the sprint changed from Sprint A, then to Sprint B, and later on, to Sprint C, Sprint A shows the scope change but Sprint B does not show the issue and the scope change at the Burndown Chart and the Sprint Report.

      Steps to Reproduce

      1. Enable "Parallel Sprints" at the Admin > Applications > Jira Software Configuration
      2. Create some stories a, b, c, d with 1 point each
      3. Create sprint 1
      4. Add stories a e b to the sprint 1
      5. Start sprint 1 (it will have 2 points to be done from the story a and story b)
      6. Transition story a to done (remaining 1 point to be done from story b)
      7. Create sprint 2
      8. Edit story b and change the sprint to sprint 2, confirming the scope change
      9. move story c from the backlog to sprint 2
      10. Complete sprint 1 (1 point done, 1 point removed)
      11. Start sprint 2 (2 points to be done from story b and story c)
      12. Create sprint 3
      13. Transition story c to done (1 point)
      14. Move story d from backlog to sprint 3
      15. Edit story b and change the sprint to sprint 3, confirming the scope change

      Expected Results

      Burndown Chart/Sprint Report for Sprint 2 was expected to be equal to the Burndown Chart /Sprint Report for Sprint 1

      • Starting with 2 points, changing to 1 point;
      • Scope change caused by story b

      Actual Results

      For Sprint 2, Both Burndown report and Sprint Report do not show story b
      The starting value, initially showing 2 points, is now starting at 1 point.
      The scope change is not presented.

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available

            [JSWSERVER-20840] Scope Change caused by moving issue to another sprint is only presented at the first time on the Burndown Chart and Sprint Report

            There are no comments yet on this issue.