Scrum backlog jumps (scrolls instantly) to top whenever an issue is ranked via drag-drop

XMLWordPrintable

    • Type: Bug
    • Resolution: Duplicate
    • Priority: Low
    • None
    • Affects Version/s: 7.1.1
    • Component/s: None
    • Environment:
    • 7.01

      In any scrum Backlog, dragging and dropping an issue causes the entire backlog view to instantly scroll to the top. This is extremely frustrating when doing backlog grooming on a large backlog. Every time we reorder an item the page jumps to the top and we lose our spot in the backlog.

              Assignee:
              Unassigned
              Reporter:
              Nathan Nantais
              Votes:
              0 Vote for this issue
              Watchers:
              7 Start watching this issue

                Created:
                Updated:
                Resolved: