It would be helpful for a user to be able to select epic as a preconfigured swimlane on the scrum boards

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Fixed
    • Component/s: None

      It would be great if there was already a preconfigured option for epics when basing swimlanes when configuring the scrum board.

        1. Screen Shot 2012-10-26 at 9.54.44 AM.png
          19 kB
          Davey Lei
        2. epic_swimlane.png
          8 kB
          Fabian Meier

            Assignee:
            Unassigned
            Reporter:
            Davey Lei
            Votes:
            50 Vote for this issue
            Watchers:
            38 Start watching this issue

              Created:
              Updated:
              Resolved: