-
Suggestion
-
Resolution: Duplicate
-
1
-
Our work items may have different "weight" depending on the column they're in. For example, we have a work item type that is very easy for development (1/10 the dev work that other items are) but is the same work for QA and Operations as other work items. We've found the best way to do that is to be able to configure the column constraints differently for each column, based on a separate field (such as Story Points, or Work Item Weight, or whatever). So we want to configure one column for a constraint of 3 "Work Item Weights" but the next column for a constraint of 5 items. We can do this today in that old fashioned task board, but were disappointed to find it unavailable in the newfangled Rapid Board. We're stuck using both, for different things (sigh).
- derived from
-
JSWCLOUD-4917 Allow Column Constraint to be set to any numeric field (i.e Story Points)
- Gathering Interest
- duplicates
-
JSWCLOUD-4917 Allow Column Constraint to be set to any numeric field (i.e Story Points)
- Gathering Interest
- has a derivative of
-
JSWCLOUD-6755 Total story points or time estimate in Rapid Board columns
- Gathering Interest
- incorporates
-
JSWCLOUD-2521 As a project manager I would like to spread one Kanban WIP limit across multiple subcolumns
- Future Consideration
- is related to
-
JSWCLOUD-6479 As a user, I'd like to have WIP limits by story points in Work mode columns
- Closed
-
JSWCLOUD-6755 Total story points or time estimate in Rapid Board columns
- Gathering Interest
- relates to
-
JSWCLOUD-3772 As a rapid board owner I would like to be able to have a column constraint for "Issues, excluding Sub-Tasks"
- Closed