Using New JIRA Experience, status is broken in Swimlane based on Story

XMLWordPrintable

    • 5
    • Severity 3 - Minor

      Summary

      Using the New JIRA Experience the status is broken in the boards where the swimlane is based on Story.

      Steps to Reproduce

      1. Create a board and set the Swimlane to Story
      2. Create some Stories with multiple Subtask

      Expected Result

      Status is fully displayed in each Story.
      Example using old JIRA Experience:

      Actual Result

      Status is not fully displayed in the Swimlane.

      Workaround

      Switch back to old JIRA Experience

              Assignee:
              bojack🐴
              Reporter:
              Francisco Oselame (Inactive)
              Votes:
              9 Vote for this issue
              Watchers:
              17 Start watching this issue

                Created:
                Updated:
                Resolved: