Time Estimation failing to calculate

XMLWordPrintable

    • Type: Bug
    • Resolution: Fixed
    • Priority: Medium
    • Component/s: None

      Summary

      When Using Time Estimation the estimate values are not displayed

      Environment

      • JIRA v7.1.0-OD-04-012
      • JIRA Agile v7.1.11-D20160106T005545

      Steps to Reproduce

      1. In Board Configuration
      2. SET Estimation Statistic to Original Time Estimate
      3. Set Time Tracking to Remaining Estimate and Time Spent

      Expected Results

      Estimation is calculated

      Actual Results

      No Estimation Calculated in

      • Streetlight icons on backlog view
      • Versions in backlog
      • Workload By Assignee:

      Notes:
      Time format is represented with a NULL value and needs to be re-associated

      Workaround

      • Go to Time tracking settings:
        • G + G time tracking
          or
        • https://<INSTANCE_NAME>.atlassian.net/secure/admin/TimeTrackingAdmin!default.jspa
      • Deactivate
      • Confirm that the following value is set to pretty
        • Time format: pretty
      • Activate

            Assignee:
            bmccoy
            Reporter:
            Earl McCutcheon
            Votes:
            5 Vote for this issue
            Watchers:
            15 Start watching this issue

              Created:
              Updated:
              Resolved: