Bug
-
Resolution: Unresolved
-
Low
-
None
-
7.13.18, 8.14.0, 8.17.1
-
None
-
7.13
-
2
-
Severity 3 - Minor
-
0
-
Issue Summary
Modifying original estimated and logged work doesn't result in the correct remaining estimate
Steps to Reproduce
1. Create an item of type Bug/Story/Epic/Task/New Feature/Test Execution
2. Edit it with original estimate 2h
3. Log work 2h
4. Go to the Edit button and modify the original estimate to 1h
5. Modify logged work from 2h to 1h
Expected Results
The correct 3 info on the right side of the test page: Original estimate: 1h, Remaining estimate: 0, Logged work: 1h
Actual Results
The original estimate and logged work at the right side of the test are both with 1h, but the remaining estimate is also 1h, when it should be 0m
Workaround
Currently, there is no known workaround for this behavior. A workaround will be added here when available
- duplicates
-
JRASERVER-42743 Automatically calculate Remaining Estimate based on Original Estimate and Time Spent