Time Tracking overlaps with sub-issues time log

XMLWordPrintable

    • 6
    • 4
    • Severity 3 - Minor
    • 1

      When sub-task have a long 'summary' or 'assignee' with a long display name. The time log of sub-task will crush with the parent issue time tracking section. Tested in IE, Chrome and Firefox.

      To reproduce the problem:

      1. Create an issue and set the Estimated time.
      2. Create few sub-task by using a long summary and/or long user name for assignee. At the same time also set the Estimated time for each.

      Please see the attachment.

      Another symptom in IE9 is that, the Subtask's Ordering Arrow is vanishing when being mouse over.

        1. Capture.PNG
          136 kB
          AmandaA
        2. Capture2.PNG
          141 kB
          AmandaA

            Assignee:
            Unassigned
            Reporter:
            AmandaA
            Votes:
            6 Vote for this issue
            Watchers:
            8 Start watching this issue

              Created:
              Updated:
              Resolved: