-
Bug
-
Resolution: Fixed
-
High
-
4
-
Minor
-
0
-
-
Warranty
Issue Summary
When configuring a workflow validator to enforce input in the Time Tracking field (e.g., time spent), the validation fails to recognize the input values in Team-managed projects.
As a result, the transition does not complete, even when the required time tracking fields have been correctly filled in.
Some other examples include:
- the linked issue field
Steps to Reproduce
- Add the validate a field rule to a transition to validate the Time tracking field
- Populate the Time Spent field logging any time on the time tracking.
- Perform the transition
Expected Results
We should not be able to add time tracking as a field validation.
Actual Results
The error message is shown and prevents the transition, even though the validator is fulfilled.
Transition failed Add value in Time tracking (Error message which was set in the Validate field function)
Workaround
Do not use the time tracking field to validate against time spent. Instead use either:
- Σ Time Spent: To validate against the total time spent across worklogs
- Time spent: To validate against a value entered in a transition screen. Please note that this is currently unsupported in team managed projects and you can follow https://jira.atlassian.com/browse/JRACLOUD-83879 around support for transition screens in team managed projects.
- relates to
-
JRACLOUD-94848 Ability to use timeSpent, Total time spent and other related time tracking fields in team managed workflows
- Gathering Interest
- mentioned in
-
Page Loading...