Include Story point statistic for Workload pie chart

XMLWordPrintable

    • 5
    • 10

      Summary

      Currently, with the Workload Pie Chart gadget in a Jira Dashboard, the Time field to report on can only be done with time-based estimates and not Story points.

      Proposed solution

      Include Story points as an option for reporting on in the gadget. This would allow Agile teams who do not depend on time-based estimates to get the total workload based on Story point values and not just time values.

              Assignee:
              Unassigned
              Reporter:
              Belto (Inactive)
              Votes:
              43 Vote for this issue
              Watchers:
              14 Start watching this issue

                Created:
                Updated:
                Resolved: