-
Suggestion
-
Resolution: Unresolved
-
110
-
53
-
NOTE: This suggestion is for JIRA Cloud. Using JIRA Server? See the corresponding suggestion.
Hi
We are trying to use the time tracking features in JIRA as much as possible.
One of the main places for room for improvement is reporting. Currently, the only reports are the time tracking report and the developer workload report.
Those two reports have a very specific filter which cannot be configured.
Wouldn't it be a good idea, easy enough, to use the current filtering system in JIRA, and extend it with a "time tracking view" option, so only the selected items in the filter are used in the time tracking report?
So if I want to do a time tracking report of issues for version 3.0 in the "UI" component, i can first do a search for those isssues, and then click on a "time tracking view" button/link.
Of course, this ideally should be complemented by the ability to use the time tracking fields on a search (see JRA-961).
- has a derivative of
-
JRACLOUD-13729 Version Workload and Time Tracking Reports should include options for showing Resolved/Unresolved and Complete/Incomplete issues
- Closed
- incorporates
-
JRACLOUD-14257 User Workload Report by Groups
- Closed
-
JRACLOUD-14437 Time Tracking Report - to include Date filters
- Closed
-
JRACLOUD-14674 Implement component centric "Component Workload Report"
- Closed
-
JRACLOUD-16376 User Workload Report across all projects
- Closed
-
JRACLOUD-18753 Exclude Closed issues in Time Tracking Report
- Closed
- is related to
-
JRACLOUD-6137 Generate worklog report
- Closed
-
JRACLOUD-14532 Cross-project issues' workload consolidation
- Closed
-
JRACLOUD-18294 Add ability to sort "Time Tracking" report by additional fields....
- Closed
-
JRACLOUD-12312 Search by work log user entries
- Gathering Interest
-
JRACLOUD-81530 Ability to have the time tracking report with granular tracking information
- Gathering Interest
-
JRASERVER-3427 Filter-based time tracking reports
- Gathering Interest
-
JSWCLOUD-17326 How can I generate a report of time logged per person and not per task?
- Gathering Interest