-
Bug
-
Resolution: Fixed
-
Medium
-
10.46
-
Severity 2 - Major
-
-
Ship Date persists
-
The ship date is missing. According to the audit log, it was removed by the connector after sync. As a result, RV has the incorrect date displayed in the program room (e.g. 1969 or 1970)
-
No
STR:
1. Create a release vehicle in Align and push it to Jira
2. Shortly after item gets synced to another tool check if RV has ship date in Align.
ER:
Ship Date persists
AR:
The ship date is missing. According to the audit log, it was removed by the connector after sync. As a result, RV has the incorrect date displayed in the program room (e.g. 1969 or 1970)
- relates to
-
ALIGNSP-109 Loading...