Uploaded image for project: 'Jira Align'
  1. Jira Align
  2. JIRAALIGN-8047

Drag and drop Capability/Epic into a Program Increment within Backlog view removes the WSJF Prioritization

XMLWordPrintable

      Issue Summary

      WSJF score is assigned in the unassigned backlog to an Epic/Capability and a user Drags and drops the capability into a Program Increment within the backlog view, notice that the WSJF score is set to 0 for the PI after the drag and drop.

      This is reproducible on Data Center: (yes) / (no)

      Steps to Reproduce

      • Navigate to Epic/Capability backlog view
      • Open the details panel for any one Capability/Epic from the unassigned backlog and assign the WSJF score
      • Save and close the work item
      • Drag and drop the same Capability/Epic to a Program Increment within the backlog view
      • Refresh the page
      • Notice that the WSJF value is set to 0

      Expected Results

      WSJF score would be carried over when assigning a new PI by dragging & dropping the Epic/Capability within the backlog view

      Actual Results

      WSJF value initially assigned is removed when dragging an dropping Capability/Epic from unassigned backlog to a PI within the backlog view

      Workaround

      Assign WSJF score in the unassigned backlog and then update the PI with the Capability/Epic slide out. This will transfer WSJF score from the unassigned backlog to the new Program increment timebox.

              fea1a6ef3355 Yannick Genin
              935a1c2f5863 Arathi M S
              Votes:
              1 Vote for this issue
              Watchers:
              4 Start watching this issue

                Created:
                Updated:
                Resolved: