-
Bug
-
Resolution: Unresolved
-
Low
-
None
-
10.129.3
-
Severity 3 - Minor
-
No
Issue Summary
In the bottom right corner of the Product Room, the Stories for Active Sprints section should show all stories in active sprints where the criteria uses the current date to compare with the date of the Sprint Anchor (Sync Date of the sprint)
An expected list of stories is shown in this section, if the current date matches the anchor dates, but is before the End date of the anchor. However if the current date is the same as the end date of the sprint anchor then the stories will not be listed in the Stories for Active Sprints section
This issue was seen in a cloud environment where the Jira Align instance was hosted in US Eastern Time, however the Jira Align console preferences of the user were set to UK Time. It is possible that these timezone differences affect how the current date is matched to the Anchor Sprint
Steps to Reproduce
The following reproduction was actually done in a Jira integrated configuration, meaning the sprints, stories and epics/features were originally created in Jira.
- Setup a Product and link it to a PI
- Make sure the PI has a sprint anchor covering the current week
- Make sure a Sprint exists for the sprint anchor
- Make sure a Feature exists that is tied to the PI and that the feature has some child stories that are assigned to the sprint.
- Make sure the sprint is Active ((In Development)
- On a date that is within the date of the Sprint Anchor (PoInt 2) that is not the last date of the sprint anchor go to Product > select Product (as created in Point 1) to open the Product Room
- Review the content of the Stories in Active Sprints section you should see the stories from Point 4 above.
- In the details of the PI , change the last date of the Sprint Anchor so that it is set to today's date (or wait for today's date to match the Sprint Anchor Date
- Refresh or reopen the Product Room , the stories will no longer be displayed inm the Stories for Active Sprints section
Expected Results
Stories for Active Sprints should show a list of storied where the Active Sprint is determined from the current date being compared inclusively with the start and end dates (and the dates in between) of the Sprint Anchor
Actual Results
Stories for Active Sprints do not display stories in an active sprint when the current date matches exactly with the End Date of the Sprint Anchor .
Workaround
Set the end date of the sprint anchors to one day later than the Finish date of the sprints (and make sure your sprints are completed on time)
- is connected to
-
JAAND-3681 Loading...