Uploaded image for project: 'Jira Align'
  1. Jira Align
  2. JIRAALIGN-6661

Enterprise Insight-Spelling mistake in Success Criteria table

XMLWordPrintable

    • 1
    • Severity 3 - Minor
    • No

      Issue Summary

      In Enterprise insight, the Success Criteria table includes the following column

      "Matric Measured Increment"

      The closest field in a success criteria is called "Metric Measure" which indicate that the spelling is likely at fault

      Steps to Reproduce

      1. Check schema for Success criteria
      2. notice the column "Metric Measured Increment" is misspelt

      Expected Results

      The column should show "Metric Measured Increment" in enterprise insight

      Actual Results

      The column shows "Matric Measured Increment" in enterprise insight

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available

              dguimbellot@atlassian.com David Guimbellot
              0ed961e27eb4 Erwann (Inactive)
              Votes:
              2 Vote for this issue
              Watchers:
              5 Start watching this issue

                Created:
                Updated:
                Resolved: