Issue Summary
Currently even if one has set to use Progress by Count for the Progress Bars Status under: Jira Align Administration > Settings section> Platform> Portfolio tab> Manage: Progress Bars or Jira Align Administration > Settings section> Platform> Portfolio Specific configuration > {PortolioName} we are still seeing the Story by Points information.
If no estimation point is used and the setting is set to use Count instead of Story Point, we should have the ability to not display the estimation information.
Steps to Reproduce
Pre-Requisite:
Set Progress by Count for the Progress Bars Status under:
Jira Align Administration > Settings section> Platform> Portfolio tab> Manage: Progress Bars
or
Jira Align Administration > Settings section> Platform> Portfolio Specific configuration > {PortolioName}
- Create an Epic
- Create a feature as a child of the Epic
- Create a story as a child of the feature
- Accept the story without adding any estimation point
- Accept the feature
- Go back to the Epic and scroll down to the Features section
- Hover over the progress bar to display the tooltip
Expected Results
The tooltip honors the Portfolio settings and displays the Progress by Count information.
Examples of what the tooltip could show :
Actual Results
The tooltip information still shows the progress by story points and does not take into account the Portfolio settings: Progress by Count
Workaround
Currently, there is no known workaround for this behavior. A workaround will be added here when available
- relates to
-
JIRAALIGN-6296 DONE % information in the Progress bar tooltip does not honor the Progress Bars Portfolio platform settings
-
- Short Term Backlog
-
-
PS-165272 Loading...
- is connected to
-
JAROT-538 Loading...
- resolves
-
ALIGNSP-23009 Loading...
-
PS-158581 Loading...