Uploaded image for project: 'Jira Align'
  1. Jira Align
  2. JIRAALIGN-6233

ADO connector deleting hyperlinks when JA syncs with the Story/Features

XMLWordPrintable

    • 1
    • Severity 3 - Minor
    • No

      Issue Summary

      ADO connector deleting hyperlinks when JA syncs with the Story

      When adding additional hyperlinks in user stories in ADO, the connector is deleting these links.

      Steps to Reproduce

      1. Create Story in ADO and allow it to sync on JA
      2. Go to Links > Add Existing link > select Hyperlink
      3. Add any link URL and Save
      4. Allow the story to sync
      5. Check the History of the Story on ADO
      6. We can see the Hyperlink added and after the sync Hyperlink is deleted.

      this problem impacts both Features and Stories, and it removes/deletes hyperlinks only, but not links to other work items 

      Expected Results

      Hyperlinks added on ADO should not be removed for both Features and Stories

      Actual Results

      ADO connector deleting hyperlinks added to Features and Stories

      Workaround

      "Add Hyperlink to ADO", if we disable it, the links are not impacted on ADO anymore.

              fea1a6ef3355 Yannick Genin
              37857daa0c44 Mangala Narayana
              Votes:
              1 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: