-
Type:
Bug
-
Resolution: Fixed
-
Priority:
Low
-
Affects Version/s: 10.126.0
-
Component/s: Jira Connector - Configuration
-
Severity 3 - Minor
-
No
Issue Summary
This is reproducible on Data Center: (yes) / (no)
Steps to Reproduce
- Navigate to new Field management tab.
- Target Completion date is already mapped in my config, but I change the mapping to another date field (JSW built-in or custom).
- It shows successfully saved in the flag on bottom left.
- I refresh the page and see an error with the message "Field mapped incorrectly"
Expected Results
I expect no error since the original mapping saved successfully and the fields I mapped are date field types.
Actual Results
The below exception is thrown in the xxxxxxx.log file:
...
Workaround
Currently there is no known workaround for this behavior. A workaround will be added here when available
- is connected to
-
JAIAC-4189 Loading...
- is related to
-
PS-152541 Loading...