-
Bug
-
Resolution: Fixed
-
Low
-
10.125.2
-
2
-
Severity 3 - Minor
-
No
Issue Summary
Having the following configuration:
- Connector > Assign features (jira epics) to multiple Jira projects in Jira Align = Yes
- T-shirt as estimation system
This configuration combination may lead Features to not sync from Jira Align to Jira once add more than 1 project.
This is reproducible (yes)
Steps to Reproduce
- Enable in the connector: Multiple Jira Projects to a Feature
- Use a t-shirt as the main estimation system
- Add two or more Jira Projects to a Feature
- Wait until it syncs as two or more new Jira Epics
- In the customer the fourth Jira Project didn't sync as a Jira Epic
Expected Results
The Feature should create another issue for the new project in Jira
Actual Results
No log fail in Splunk
No sync from Jira Align to Jira happen
Also the field ItemtoSyncDate = null
...
Workaround
force manually the sync through an update in any Feature field, like description or title
can also set Jira Project assignments when Feature is first being created to avoid problem
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
- resolves
-
ALIGNSP-20932 Loading...
-
PS-159251 Loading...