Backlog: Items synced with JIRA are reverting to the previous process step after were moved on the backlog process step board view

    XMLWordPrintable

Details

    • 2
    • Severity 2 - Major
    • Hide
      There should be a JIRA connector configured. Process steps mapping to JIRA should also be configured for the program.

      1. Open Feature Backlog for the program from preconditions

      2. Navigate to Process Step view

      3. Move some feature to another process step column

      4. After next sync runs reload the page and validate if the feature is still located in the column from the previous step
      Show
      There should be a JIRA connector configured. Process steps mapping to JIRA should also be configured for the program. 1. Open Feature Backlog for the program from preconditions 2. Navigate to Process Step view 3. Move some feature to another process step column 4. After next sync runs reload the page and validate if the feature is still located in the column from the previous step
    • Feature persists in the column
    • The feature goes back to the previous column. If we check the audit log we could see that the process step was reverted by the connector
    • A-Team - TART3

    Description

      STR:
      There should be a JIRA connector configured. Process steps mapping to JIRA should also be configured for the program.
      1. Open Feature Backlog for the program from preconditions
      2. Navigate to Process Step view
      3. Move some feature to another process step column
      4. After next sync runs reload the page and validate if the feature is still located in the column from the previous step

      ER:
      Feature persists in the column

      AR:
      The feature goes back to the previous column. If we check the audit log we could see that the process step was reverted by the connector

       

      Workaround: Make the developmental process step change directly on the work item slideout as opposed to the kanban backlog.

      Attachments

        Issue Links

          Activity

            People

              tdavenport@atlassian.com Tony D.